Remarks
• The aircraft was completely painted and refurbished in August 2014
• Aircraft Enrolled in and Current on CAMP Maintenance Tracking Program
• Last Inspections:
• 96M, 48M and 36M Inspection performed on the August 14th, 2014
• 24M Inspection performed on the July 27th, 2016
• 6400H, 3200H and 1600H Inspections performed on the March 16th, 2016
• STCs installed (according EASA and FAA)
• Installation of Multiple Cabin Interior Arrangement with Emergency Lighting and Oxygen Systems
• Installation of the Passenger Address System
• Installation of Interior Panels (Head-liner, Sidewall Windowliner etc.)
• Spares Ground Handling and Maintenance Provisions
• Installation of Antennas, Drain Masts and Pressure Vessel Feedthroughs
• Installation of Potable Water Systems
• Installation of Insulation Blankets
• Installation of Safe Flight Throttle Quadrant
• Installation of Safe Flight Enhanced Auto Power System (-2 Configuration)
• Installation of Rosen Cockpit Sun Visors
• DBU-5000/DBU-5010E Data Base Unit Replacement